Specifications include, but are not limited to: 1. Prospective contractor shall perform the removal of existing vent boots ridge cap. And the removal of all debris from project site. 2. Prospective contractor shall be responsible for all safety barriers like orange construction fence to keep bystanders out of work areas and at a safe distance or equivalent. 3. Prospective contractor shall be responsible for any permits that maybe required. 4. Prospective contractor shall furnish all materials, tools and labor, equipment to install new .60 mil TPO mechanically fastened roof system with 1 ½" expanded polystyrene underlayment or equivalent roof Approx. (1’209 sq. ft.) 5. Prospective contractor shall install new 1 ½" expanded polystyrene flute fill to level up with the ribs of metal roof. 6. Prospective contractor shall mechanically fasten one layer of 1" polyisocyanurate roof insulation over the prepared surface with Firestone/Elevate mechanical heavy-duty fasteners and 3" metal insulation plates or equivalent. 7. Prospective contractor shall install new treated wood nailers at the eve and rake edges to match new insulation height...